We offer fantastic energy in high quality and enhancement,merchandising,profits and promoting and procedure for New Arrival China Aerial Suspended Construction Working Gondola Zlp-1000 Suspended Platform, Accurate process devices, Advanced Injection Molding Equipment, Equipment assembly line, labs and software development are our distinguishing feature.
We offer fantastic energy in high quality and enhancement,merchandising,profits and promoting and procedure for Construction Working Gondola, Suspended Platform Zlp-1000, Suspended Working Gondola, Our product quality is one of the major concerns and has been produced to meet the customer’s standards. “Customer services and relationship” is another important area which we understand good communication and relationships with our customers is the most significant power to run it as a long term business.
Description:
Suspended Platform, a kind of Temporarily Installed Suspended Access Equipment, also as known as Temporary Access Equipment or Electrical Scaffolding is a light weight rigid steel made object capable of carrying persons onto a certain height so as to facilitate the aerial work, such as maintenance, decoration, cleaning, etc. We offer Steel Suspended platform , Aluminum Suspended Platform and also Construction Hoist.
Technical specification:
Suspended platform ZLP500/ZLP630/ZLP800 |
|||||
Type |
ZLP800 |
ZLP630 |
ZLP500 |
||
Rated Capacity |
800KG |
630KG |
500KG |
||
Rated Lifting Speed |
8.3 m/min |
9.6m/min |
9.6m/min |
||
Length of Platform |
7.5m |
6m |
4~5m |
||
Wire Rope Diameter |
8.6mm |
8.6mm |
8.6mm |
||
Hoist | Type |
LTD 8 |
LTD 6.3 |
LTD 5 |
|
Rated Lifting Force |
8KN |
6.3KN |
5KN |
||
Motor | Power |
2.2KW |
1.5KW |
1.1KW |
|
Voltage |
380V |
380V |
380V |
||
Frequency |
50 Hz |
50Hz |
50 Hz |
||
Rotation Speed |
1420rpm |
1420rpm |
1420rpm |
||
Brake Torque |
15Nm |
15Nm |
15Nm |
||
Safety Lock | Type
|
LSB30 |
LSB30 |
LSB30 |
|
Permission Force of Impact |
30kN |
30kN |
30kN |
||
Locking Cable Distance |
<100mm |
<100mm |
<100mm |
||
Locking Cable |
3°~8° |
3°~8° |
3°~8° |
||
Suspended mechanism | Projecting length |
1.3~1.5m |
1.3~1.5m |
1.3~1.5m |
|
Adjustable height of the beam |
1.44~2.14m |
1.44~2.14m |
1.44~2.14m |
||
Weight | Weight of Lifting Part |
600kg |
495kg |
445kg |
|
Weight of Suspension Mechanism |
360kg |
360kg |
360kg |
||
Counter-Weight |
1000kg |
900kg |
750kg |
1. Decoiler
2. Feeding
3.Punching
4. Roll forming stands
5. Driving system
6. Cutting system
Others
Out table